2x150 MW Coal based Power Project at Mozambique, Africa
Jindal Mozambique Minerais Limitada – a Jindal entity – owns and operates a 3 MTPA mining concession at Chirodzi in the Tete province. The mine has been operational since March 2013 and production can be further expanded to 10 MTPA. Jindal mines its own coal and exports coking coal to its steel plant in India on its wagons and engines. It has allocated capacity on the Sena rail line. A 2x150 MW power plant is to be developed within the mining concession by a Jindal entity "Jindal Investimentos Lda.
Current Status:
- Investment approval: Received
- Project feasibility report: Completed
- Environment and social impact assessment, ESIA, study: Completed& approval received
- Issue of EPC tender documents: By Oct 2015 as a LSTK contract
- Award of Owner's Engineer by July / Aug 2015
- Issue of bankable feasibility study (detailed project report) tender documents: Done and in the process of final completion
- Land Acquisition: Already available
- PPA (Power Purchase Agreement), is in advanced stages of negotiation