Etalin Hydroelectric Project, Arunachal Pradesh (3097 MW)
The project is being executed through the Etalin Hydro Electric Power Company Limited, a JV company of Jindal Power Limited and Hydro Power Development Corporation of Arunachal Pradesh Limited (A Govt of Arunachal Pradesh Undertaking).
The installed capacity of the project is 3097 MW as per the detailed project report. Etalin HEP is envisaged as a run of the river scheme on rivers Dri and Tangon in the Dibang Valley District of Arunachal Pradesh. It is the largest of the hydroelectric projects being currently developed in India.
Kamala Hydroelectric Project, Arunachal Pradesh (1800 MW)
The project is being executed through Kamala Hydro Electric Power Company Limited, a JV company of Jindal Power Limited (74%) and Hydro Power Development Corporation of Arunachal Pradesh Limited (26%). The power potential studies have been concurred by the Central Electricity Authority for an installed capacity of 1800 MW as against the allotted capacity of 1600 MW. Kamala HEP is envisaged with twin objectives of power generation and flood moderation and is being set up on the Kamala River in the Lower Subansiri District of Arunachal Pradesh.
Attunli Hydroelectric Project, Arunachal Pradesh (500 MW)
The project is being executed through Attunli Hydro Electric Power Company Limited, a JV company of Jindal Power Limited (74%) and Hydro Power Development Corporation of Arunachal Pradesh Limited (26%). Attunli HEP is envisaged as a run of the river scheme on the Tangon River in the Dibang valley district of Arunachal Pradesh. The power potential studies endorsed by the Central Electricity Authority are for an installed capacity of 680 MW as against the allotted capacity of 500 MW. The Etalin Hydro Electric Power Company Limited also proposes to set up a small 22-MW plant at Anopanifor meeting the construction power requirements of the Etalin Hydroelectric Project.